ABS Tools & Accessories Inch

Key Features

  • Express Delivery Available – Fast shipping options to minimise downtime and keep your projects on schedule.
  • Premium Quality Materials – Manufactured from high-quality, durable materials to ensure long-lasting performance.
  • Cost-Effective Solutions – Take advantage of significant discounts on a wide range of products.
  • Comprehensive Pipe Tools – Includes pipe saws, chamfer planes, emery cloths, and more for precise cutting and preparation.
  • Essential ABS Pipe Accessories – Brushes, cleaning fluids, and solvent cement are available for easy installation and secure joints.
  • Reliable Connection Accessories – Includes EPDM flat gaskets, backing rings, and pipe brackets to ensure robust, leak-free connections.

Basic Fitting Guidelines

ABS solvent cement welding offers a simple and quick means of constructing high integrity leak-free joints. Correctly made joints are stronger than either the pipe or fitting. The solvent cement operates by chemically softening the outside of the pipe and the inside of the fitting. ABS pressure pipes and fittings are designed for an interference fit. Although ABS solvent cement has good gap filling properties, no attempt should be made to increase the clearance between pipe and fittings by excessive abrading. Joint integrity is greatly reduced if these surfaces are not absolutely clean and properly prepared. The procedure detailed below must be followed.

Please note, under no circumstances should sealing paste be as this can be harmful to ABS products.

We ask customers to bear in mind that we always advocate following the manufacturer’s instructions. The instructions below are offered as basic guidelines only.

  • The pipe must be cut clean and square. A plastic pipe saw or suitable wheel cutter should be used.
  • File a chamfer, approximately 3mm x 45°. This prevents the solvent cement layer being scraped from the surface of the fitting when the joint is assembled.
  • Mark the pipe a known distance from the end and clear of the area to be abraded. This should be used to check that the pipe is all the way into the socket after assembly.
  • Thoroughly abrade the end of the pipe over a length equal to the depth of the fitting socket, using clean, coarse emery cloth.
  • Thoroughly abrade the socket of the fitting.
  • Thoroughly clean the abraded surfaces of the pipe and fittings. Use a clean, lint free cloth or paper towel, moistened with MEK cleaner.
  • Remove the lid from the ABS solvent cement and give it a stir.
  • Using a clean brush, approximately half as wide as the pipe to be jointed, apply cement to the pipe and fitting using longitudinal strokes. The abraded areas should be completely covered with cement. The amount required will vary depending on the pipe diameter and the fit between pipe and fitting, but in all cases should be such that the cement is still liquid to allow surfaces to slide when the pipes and fittings are assembled. It is important to apply cement quickly, to enable assembly without excessive force being required.
  • Immediately after application of cement, push the pipe fully home into the fitting. Do not twist. Hold the pipe and the fitting for times varying from a few seconds on sizes 3⁄8" or 16mm to 1 minute on sizes 8" or 225mm and above. Application of the correct amount of cement will result in a neat bead of cement at the edge of the fitting and at the edge of the pipe. Excessive deposits of solvent cement inside the fittings must be avoided as these can weaken the wall, particularly on small sizes. When working under cold conditions, make sure the joints are free from frost and moisture and allow extra curing time to compensate for the lower temperature.
  • Wipe off excess cement from the outside of the joint.
  • Replace lids on tins.
  • Clean the brush in MEK cleaner.

After 24 hours under normal conditions (dry and with an ambient temperature of 20°C), the cement within the joint will have dried enough to be able to withstand the rated pressure of the ABS pipe system. Please note that the drying time in a pipe system only starts on the completion of the last joint. After 24 hours the pipe system can be fully pressure tested. The test pressure should be equal to 1½ times the rated pressure of the lowest rated fitting or pipe within the system.

Please note that both solvent cements and cleaners produce fumes, therefore, we recommend that the jointing procedure should be undertaken in a well-ventilated area. We also recommend ventilation within the pipe system during assembly to disperse any potentially harmful vapours.

We have a range of the above-mentioned pipe accessories to help with the installation and maintenance of our fully matched ABS pipe systems. Our accessories and tools are manufactured from the highest quality materials and are available at discounted prices.

IMPORTANT: The technical data given on this website is for preliminary information purposes only and is published without guarantee. All line drawings are for illustrative purposes only and should not be regarded as wholly accurate in every detail. We reserve the right to withdraw or to alter the specification of any product without notice. For more information, please consult our Terms of Business.

If you require any further information, our excellent customer service team is here to help so please call us on 01794 835835.

 

Loading...